| # Solution - Distribute Replication Tasks via a Shared Filesystem |
| |
| ## <a id="prerequisite"> Prerequisite |
| |
| This solution is based on this change to the operational nature of the replication plugin: |
| |
| https://gerrit-review.googlesource.com/c/plugins/replication/+/239212 |
| |
| If this approach is not taken, then this design will likely need to be revised. |
| |
| ## <a id="overview"> Overview |
| |
| The solution is to coordinate the distribution of the replication tasks as evenly as possible across |
| all the nodes in the cluster via sharing the filesystem hosting the persisted replication tasks via |
| a shared filesystem such as NFS. The high level tasks that will be used to achieve this are: |
| |
| ### 1) Modifying the persisted task store so that it can be safely shared across multiple nodes via a shared file system |
| |
| ### 2) Use a directory lock to ensure replication to the same URI does not occur concurrently in the cluster |
| |
| ### 3) Distribute the tasks among masters by periodically adding every replication task from the persisted store to the replication queue on every node |
| |
| ### 4) Improve task distribution with random delays |
| |
| ## <a id="detailed-design"> Detailed Design |
| |
| ### The Current Replication Mechanism |
| |
| Overview of the ordered events that happen when a ref updates: |
| |
| ##### i) Gerrit updates a ref |
| |
| ##### ii) Gerrit fires a event |
| |
| Currently when an action on the Gerrit server updates a ref, it fires a |
| gitReferenceUpdatedListener.Event which the replication plugin is listening for. |
| |
| Example: |
| |
| ``` |
| Event Fired by Gerrit for -> (project="All-Projects", ref="ref/meta/config") |
| ``` |
| |
| ##### iii) The replication plugin receives that project/ref based event |
| |
| The replication plugin receives the event to determine how to replicate the update. |
| |
| ##### iv) The event is split into URI based tasks |
| |
| The replication plugin first splits the project/ref based event (update to a ref in a specific |
| project) into a series of replication tasks, one for each destination configured in the |
| replication.config file. Each new replication task which is split out represents a needed git push |
| to the URI which is the combination of the updated project and the destination URIish from the |
| replication config. |
| |
| Example: |
| |
| ``` |
| url = git://destination-A:9417/${name}.git |
| -> push git://destination-A:9417/All-Projects.git refs/meta/config |
| url = git://destination-B:9417/${name}.git |
| -> push git://destination-B:9417/All-Projects.git refs/meta/config |
| url = git://destination-C:9417/${name}.git |
| -> push git://destination-C:9417/All-Projects.git refs/meta/config |
| url = git://destination-D:9417/${name}.git |
| -> push git://destination-D:9417/All-Projects.git refs/meta/config |
| url = git://destination-E:9417/${name}.git |
| -> push git://destination-E:9417/All-Projects.git refs/meta/config |
| ``` |
| |
| ##### v) Persist the specific URI/ref based tasks to the filesystem |
| |
| Each task is persisted in a json file named after the SHA1 of the json under |
| $GERRIT_SITE/data/replication/ref-updates/waiting |
| |
| Example: |
| |
| ``` |
| $GERRIT_SITE/data/replication/ref-updates/waiting/a564cbd....json |
| $GERRIT_SITE/data/replication/ref-updates/waiting/77adf32....json |
| $GERRIT_SITE/data/replication/ref-updates/waiting/07fd222....json |
| $GERRIT_SITE/data/replication/ref-updates/waiting/57bf2d2....json |
| $GERRIT_SITE/data/replication/ref-updates/waiting/bbff33d....json |
| ``` |
| |
| ##### vi) Scheduled tasks to be run after a configurable replication delay |
| |
| ##### vii) A scheduled task is put into a thread pool managed by Gerrit |
| |
| Gerrit manages the threadpool with a java ScheduledThreadPoolExecutor. The specific thread pool |
| depends on the replication configuration. Since there are a limited amount of threads, the tasks may |
| wait longer than the replication delay before executing. |
| |
| ##### viii) Consolidate pushes to the same URI |
| |
| On scheduling the plugin attempts to consolidate the push with any existing pushes for the same |
| URI which may still be waiting to run. |
| |
| Example: |
| |
| ``` |
| waiting |
| -> push git://destination-E:9417/All-Projects.git refs/dashboards/mydash |
| |
| incoming |
| -> push git://destination-E:9417/All-Projects.git refs/meta/config |
| |
| consolidated |
| -> push git://destination-E:9417/All-Projects.git refs/dashboards/mydash refs/meta/config |
| ``` |
| |
| ##### ix) Push refs |
| |
| When a slot is free in the approximate thread pool, all the ref updates for a single URI will be |
| pushed with a single git push |
| |
| ##### x) Move the persisted tasks for a URI to the running directory. |
| |
| Example: |
| |
| ``` |
| $GERRIT_SITE/data/replication/ref-updates/waiting/bbff33d....json |
| -> $GERRIT_SITE/data/replication/ref-updates/running/bbff33d....json |
| ``` |
| |
| ##### xi A) Push Fails |
| |
| If this push fails, it may either be aborted, or a retry may be rescheduled for a later time |
| (moving the tasks back to the waiting directory). |
| |
| ##### xi C) Push Succeeds |
| |
| On success, the persisted json file will be deleted from the filesystem. |
| |
| ##### Startup |
| |
| Finally, on system startup, all the existing persisted tasks will be replayed with |
| the assumption that they are still outstanding. |
| |
| ### 1) Safely sharing the persisted task store |
| |
| In order to make it safe to share the persisted task store across multiple nodes, two threads, even |
| on different nodes, may not write to the same file. This is currently possible on task creation |
| since the check for existence of a file followed by writing to it is racy. To avoid this race, first |
| write new files to a tempfile in another directory first, then move the tempfile into place. Using |
| another directory to write the file prevents the partially written file from appearing in listings. |
| |
| Example: |
| |
| ``` |
| $GERRIT_SITE/data/replication/ref-updates/building/tmp001232asf.json |
| -> $GERRIT_SITE/data/replication/ref-updates/waiting/a564cbd....json |
| ``` |
| |
| To avoid resetting timestamps which will be used in step 3, do not overwrite already existing files |
| in the "waiting" directory. |
| |
| ### 2) Prevent Concurrent replication to the same URI |
| |
| To prevent two threads, even on different nodes, from running the same task, introduce a URI based |
| filesystem "lock" that can only be acquired atomically by one thread, and only run tasks on the |
| thread which acquires the lock. URI based locking will be used instead of task level locking to |
| ensure that URI based "close in time" batching is still preserved as it would be with a single node. |
| |
| Before running a task, acquire the URI lock by creating a directory with a uriKey (the key is the |
| SHA1 of the URI). If the directory can be created, then the lock will have been acquired and any |
| tasks for that URI should be run after moving the task file from the "waiting" directory into the |
| "running" directory of the URI. If no such tasks exist anymore, assume the tasks were completed by |
| another node and unlock the URI by deleting the directory. If the directory cannot be created, |
| assume the URI is already being replicated to by another node. |
| |
| If the tasks are assumed to be already, or are currently being, replicated to by another node, skip |
| replicating to the URI without altering the persistence of the tasks. |
| |
| On startup after moving running tasks back to the waiting directory, delete the URI lock directory |
| for each previously running task. |
| |
| Example: |
| |
| Lock dir: |
| |
| ``` |
| $GERRIT_SITE/data/replication/ref-updates/running/23baf46.../ (SHA1 of URI) |
| ``` |
| |
| Two ref updates for the same URI: |
| |
| ``` |
| $GERRIT_SITE/data/replication/ref-updates/waiting/a564cbd....json |
| -> $GERRIT_SITE/data/replication/ref-updates/running/23baf46.../a564cbd....json |
| |
| $GERRIT_SITE/data/replication/ref-updates/waiting/052b7ca....json |
| -> $GERRIT_SITE/data/replication/ref-updates/running/23baf46.../052b7ca....json |
| ``` |
| |
| |
| ### 3) Periodically add all persisted tasks to the replication queue |
| |
| On each node, run a repeating distribution task which reads all the persisted tasks from the |
| "waiting" directory and adds them to the replication queue. The repeating interval of this |
| distribution task will be known as the "distribution interval". This interval should be less than |
| the replication delay, a good default for the interval is likely around 10s. Use the timestamp of |
| the oldest persisted task file for the same URI as the time basis to add the replication delay to |
| when scheduling the time to run each task. |
| |
| This distribution task should result in an approximate unified view on each node of the entire set |
| of outstanding replication tasks in the cluster. Tasks will progress "upward" on each node |
| independently as other replication tasks complete on the node. As tasks become runnable on each |
| node, if the task has already been run by another node, or is currently running by another node, it |
| should silently "drop" out of the replication queue on the non running nodes. |
| |
| An optional improvement to improve the visibility of outstanding tasks would be to remove tasks from |
| the queue which are no longer backed by tasks in the "waiting" directory even before they reach the |
| runnable state on each node. |
| |
| ### 4) Add random delays to scheduling tasks on each node |
| |
| Lastly, to get good task distribution across the cluster, particularly when one or more nodes in the |
| cluster might be mostly idle, add a small random delay to the scheduled start time of each task |
| when inserting it into the queue. A good upper bound on this delay is likely around the same as the |
| distribution interval. |
| |
| ### <a id="scalability"> Scalability |
| |
| #### Task Distribution to the nodes with available resources |
| |
| The basis of good task distribution to the nodes with available resources in the cluster should |
| depend on ensuring that the replication delay is longer than the distribution interval and good |
| clock synchronization across the nodes. If these factors are well satisfied, then it can be expected |
| that as each node gets a free thread, that it will execute any task ready to execute, resulting in |
| the nodes with the most free resources running the most tasks. This should lead to a desirable "most |
| available resources" based distribution. |
| |
| #### Task consolidation across the cluster |
| |
| Task consolidation will be impacted by the length of the distribution interval, by the length of |
| random scheduling delays inserted, and by the replication delay. Reducing the distribution interval |
| and/or increasing the random scheduling delays or the replication delay should reduce this impact |
| since, as with single node systems, the longer tasks sit in the queue on each node, the more |
| opportunities there are for consolidation to occur. |
| |
| #### CPU |
| |
| Once tasks can be shared across multiple masters, it will be possible to share any extra load that |
| new destinations will put on masters across the cluster. It should then be possible to lower the |
| dedicated thread count to each destination by the proportion of newly added threads from any |
| additional nodes added and still keep the same service to each destination. For example, if there |
| are 8 threads per destination with a single node, lowering the thread count to 4 per destination |
| when a second node is added, should still leave 8 threads available in the cluster for each |
| destination. This thread count lowering has the additional benefit that it frees up extra CPU on |
| each node for new destinations. So if there were originally 5 destinations with 8 threads each, for |
| a total of 40 threads of CPU, now with only 4 threads per destination, the destination count could |
| be doubled to 10 and there should still be enough CPU for all of them on each node. |
| |
| #### Memory |
| |
| Unfortunately even ideal distribution of persisted events across the cluster does not strictly |
| prevent the memory exhaustion problems that are possible within an individual node which are |
| accentuated when adding more destinations. However good distribution, particularly with tasks for |
| the same event, does statistically reduce the chances of memory exhaustion since it becomes less |
| likely that all the tasks for any particularly big project will get executed at the same time on |
| the same node. |
| |
| In the long run, a true QOS solution will likely be needed to guarantee that memory exhaustion is |
| not possible by running too many concurrent combinations of big projects, but good distribution |
| will on average allow a cluster to scale to handle more destinations memory-wise by adding more |
| master nodes. |
| |
| #### Replicate-All |
| |
| The replicate-all command tends to result in a significant backlog of replication tasks. As with |
| other workloads with backlogs, these should get well distributed to the nodes to where the resources |
| are available. So an individual replicate-all will scale better on the masters in clusters with more |
| nodes, but the impact to the destinations will remain the same. |
| |
| However, if startup replication were to be used, or if replicate-all were to be switched to "on |
| cluster startup" and "on node shutdown" which would be more appropriate with more than one master, |
| the impact to destinations will increase proportionally with the amount of nodes added. It is |
| possible to mitigate this somewhat during maintenance operations such as upgrades where many nodes |
| need to be restarted, by restarting the nodes closer together to benefit from the cluster's ability |
| to perform task deduplication. |
| |
| ## <a id="alternatives-considered"> Alternatives Considered |
| |
| ### Task storage alternatives |
| |
| Since the current filesystem based storage exists and can be enhanced fairly easily to satisfy the |
| desired use case as a polling based sharing solution, the extra expense of other sharing solutions |
| does not currently seem worth considering. |
| |
| ### Task distribution alternatives |
| |
| This solution uses polling for task distribution, an event based solution could be used instead to |
| reduce distribution delays. However since the distribution delay introduced by this polling |
| solution is intended to be less than the replication delay, there is not a lot to be gained by |
| using an event based solution. The biggest advantage of the event based solution would likely be to |
| decrease the chance of missed "close in time" deduplication of tasks. An event system could easily |
| be added ontop of the current polling to get this added benefit if desired. |
| |
| ### Task scheduling alternatives |
| |
| The current solution will work ontop and around the Gerrit executor, in a way that some may |
| possibly see as klunky, or not very clean. Since the java ScheduledThreadPoolExecutor has some |
| strong constraints that make it hard to override, to integrate a distributed queue more cleanly with |
| Gerrit would likely mean replacing the java ScheduledThreadPoolExecutor entirely. Doing so would |
| require modifying gerrit core which seems unnecessary to achieve good enough scheduling to scale |
| replication. Even if one were willing to modify Gerrit core, it would be very difficult to replace |
| the ScheduledThreadPoolExecutor inside Gerrit without having to re-implement most of the likely |
| very complicated scheduling logic that it already implements. However, this could likely still be |
| done after this current proposed solution is implemented without much loss of work from the current |
| solution. |
| |
| ### Memory limit alternatives |
| |
| #### 1) Setting very restrictive limits |
| |
| One stopgap measure to avoid memory exhaustion, which does not allow scaling the supported site |
| proportionally with the amount of nodes, but does allow it to scale beyond what a single node can |
| handle is to drastically reduce the thread counts per destination on each node, and to combine |
| destinations within threadpools with lower thread counts than destination counts. In the original |
| examples, this can be achieved by keeping the total concurrent per project count to 5 (the original |
| limit) per node. This requires adding 15 more nodes for a total of 16 nodes each configured like |
| this: |
| |
| ``` |
| [remote "All"] |
| url = git://destination-A:9417/${name}.git |
| url = git://destination-B:9417/${name}.git |
| url = git://destination-C:9417/${name}.git |
| url = git://destination-D:9417/${name}.git |
| url = git://destination-E:9417/${name}.git |
| url = git://destination-F:9417/${name}.git |
| url = git://destination-G:9417/${name}.git |
| url = git://destination-H:9417/${name}.git |
| url = git://destination-I:9417/${name}.git |
| url = git://destination-J:9417/${name}.git |
| threads = 5 |
| ``` |
| |
| This give a total of 16 * 5 = 80 threads which should allow 8 threads per destination total. This |
| solution does not make very good use of the available resources on each node, and every destination |
| is vulnerable to starvation by the others (they don't actually have their own thread pools anymore). |
| |
| #### 2) Distributing destinations across nodes non-homogeneously |
| |
| One, even more restricting approach, is to use non homogeneous configurations on each node. The |
| simple idea is to keep the original node as is and to add the new destinations to the second node: |
| |
| Node 2: |
| |
| ``` |
| [remote "F"] |
| url = git://destination-F:9417/${name}.git |
| threads = 8 |
| ... |
| [remote "G"] |
| url = git://destination-G:9417/${name}.git |
| threads = 8 |
| ... |
| [remote "H"] |
| url = git://destination-H:9417/${name}.git |
| threads = 8 |
| ... |
| [remote "I"] |
| url = git://destination-I:9417/${name}.git |
| threads = 8 |
| ... |
| [remote "J"] |
| url = git://destination-J:9417/${name}.git |
| threads = 8 |
| ... |
| ``` |
| |
| This solution is harder to administer and it suffers from the loss of HA with respect to |
| replication destinations. |
| |
| #### 3) Implementing per project QOS limits. |
| |
| Such a solution is complicated, but it may be implemented as an add-on to the current solution. |
| |
| ## <a id="pros-and-cons"> Pros and Cons |
| |
| Pros: |
| |
| 1. Simple to implement |
| 2. Leverages existing infrastructure (persisted events) |
| 3. Does not require external coordination |
| 4. Self scaling and balancing |
| |
| Cons: |
| |
| 1. Replication delay may be slightly increased |
| 2. Memory exhaustion is still possible |
| 3. No global view of running tasks in show-queue output |
| 4. Completed tasks may linger in show-queue output |
| |
| |
| ## <a id="implementation-plan"> Implementation Plan |
| |
| The following will is a list of changes expected to be independently implementable in the order |
| listed below. |
| |
| ### 1) Use a temporary directory to create new task files. |
| |
| Write new tasks to a tempfile in another directory, then move the tempfile into the 'waiting' |
| directory without overwriting already existing files. |
| |
| ### 2) Acquire URI Lock before running replication to a URI |
| |
| Before running a task, acquire the URI lock by creating a directory with a uriKey in the 'running' |
| directory. If the directory can be created, then run all the tasks for that URI after moving the |
| task files from the "waiting" directory into the lock directory of the URI. |
| |
| On startup after moving running tasks back to the waiting directory, delete the URI lock directory |
| for each previously running task. |
| |
| ### 3) Create a periodic distributor |
| |
| Run a distributor regularly in its own single threaded threadpool at an interval of |
| replication.distributionInterval where the default is 0 (disabled). On each interval, read each |
| persistent task from the 'waiting' directory and schedule it to run. |
| |
| ### 4) Adjust replication delays to account for distribution |
| |
| When scheduling any task (not just from the distributor), consider the replicationDelay to be the |
| maximum of either remote.NAME.replicationDelay and replication.distributionInterval. |
| |
| ### 5) Use file timestamps when scheduling tasks |
| |
| Modify the distributor's operation to schedule tasks to run a minimum of |
| remote.NAME.replicationDelay after the timestamp of the oldest persisted task for the same URI in |
| the persistent store. |
| |
| ### 6) Adjust replication delays to add some randomness |
| |
| Add a property named replication.randomDelay which will get added when scheduling any task. Default |
| the value to 1 second. |
| |
| ## <a id="time-estimation"> Time Estimation |
| |
| 1-6 can each be prototyped in around 1-3 hours each, and likely can be completed and uploaded and |
| tested in no more than a week each. |